Bathroom remodel cost

Bathroom Remodel Cost Calculator

Create a transparent bathroom-remodel budget using your own material and labor allowances plus fixed project items.

New · Design + planning

Bathroom Design & Finish Planner

Explore a coordinated look, choose what you are actually changing and carry verified floor dimensions into the separate tile-quantity tool below. This is a conceptual finish preview, not a photographed room, a scaled layout or a construction plan.

1. Measure your room

2. Choose a finish direction

3. Define the remodel scope

Joint contrast is a color illustration only; grout width, mold resistance and manufacturer suitability must be checked separately. Style choices do not imply products are interchangeable. Confirm slip suitability, waterproofing, electrical and plumbing requirements with the actual specifications and qualified professionals.

Warm SpaFinish mood board
Bathroom finish concept preview A stylized vanity, mirror, wet-area screen, wall tile and floor. Decorative illustration only; not to scale or a verified fixture layout. Concept only · finishes, not a scaled bathroom layout

Warm stone, oak-look cabinetry and a relaxed tonal palette.

Measured floor footprint56 sq ft

Select finishes, then build a checklist of your design decisions.

Planning example, not a purchase recommendation. The preview never claims that a double vanity, walk-in shower or tub fits the measured room. Layout, door clearance, ventilation, accessibility, waterproofing and local approvals must be checked from real drawings and site conditions.

Try finishes on your own photo · experimental

Photo-Assisted Wall & Floor Finish Preview

Select a photo from your device, try a guided wall/floor outline or mark the surface manually, then test a finish while retaining its existing light and shadow. The photo stays inside your browser: no account, upload, tracking endpoint or AI service is used.

An illustrative 2D mockup, not a photorealistic AI render, real product sample or measured installation plan.

What can this preview show—and what can't it?

Guided selection follows similar photographed colors: its soft mask may protect contrasting fixtures, but objects of a similar color can still be included. Four-corner patterns only approximate perspective. Check surfaces and real dimensions before buying materials or asking a contractor to install them.

See how it works before choosing a photo

Start with a free illustrated bathroom sample. Try independent wall and floor finishes instantly; no account, photo or upload needed.

Guided outline · easiest starting point

Choose Wall or Floor, press the button, then tap a clear part of the surface in your photo. Drag the blue corners to refine the suggested area.

How do the outline, tolerance and mask work?

Lower tolerance matches fewer shades; higher tolerance includes more. The private, color-based helper proposes four corners and a soft mask, not true object recognition. For busy photos, manually mark the surface, enable the object-protection brush and exclude fixtures before applying.

Quick-start finish looks

Illustrative combinations only, not real brand colors, products or accurate textures. Choose a look, then outline and apply an area; or select an applied finish below and update its appearance without tracing again.

Left: your selected finish. Right: the unedited original. The downloaded PNG always contains the complete edited result.

↑ View the updated room preview

3. If using manual mode, tap or click around one visible surface in order (at least three points), or refine the guided four corners by dragging blue handles. The sample room supports instant presets without this step. Numeric fields also work with a keyboard; each point is a percentage of photo width/height.

0 boundary points

What can the finish history recover?

Undo/redo remembers up to eight applied finish changes in this tab, including removals and clearing all finishes. Draft points and mask brush strokes have separate controls. Opening a different photo or saved project starts a new history; history is not embedded in the downloaded project.

Single PNG export keeps your photo's proportions and detail up to 2400 pixels on its longer side. The labeled before/after PNG places two equal-scale views side by side, with each panel capped at 1200 × 1800 pixels for easy sharing.

Save or reopen an editable room project

A saved .json project includes a copy of your original photo, its surface outlines and masks, finish settings and notes. Keep this personal file private. Nothing is uploaded or saved to an account. Save only after applying finishes; unfinished draft points are not included.

What goes into the brief? How is my photo kept private?

The text brief lists visual finishes, installation questions and comparison items; it does not include your photo or calculate room dimensions. Share the PNG separately if you want. Only a successfully loaded new photo resets your finishes (your notes are retained); invalid files leave the current project intact. “Remove photo, finishes & notes” clears this local editor.

Choose your photo or try the sample to begin. No file is transmitted.

Blue handles, teal mask and selection outlines are editing guides, never part of the exported PNG. Check edges around fixtures before downloading.

Review your design and measure surfaces

Use the Bathroom Design & Finish Planner with verified room measurements. Do not infer square footage, installation details or waterproofing requirements from the photograph.

PCW BATH STUDIO · CONCEPT DESIGN

A clearer vision for your next bathroom.

Enter the actual rectangular room dimensions, rotate the model and compare illustrative wall and floor finishes. The 3D room shell follows the dimensions you enter; fixture shapes and positions are concepts, not a verified fit or construction drawing.

START WITH A LOOK

Three considered palettes. Make each one your own.

YOUR DESIGN · LIVE 3D
Your interactive model loads only when you choose

Drag to look around · scroll to zoom · enable Edit layout to move fixtures

Preview measured 2D floor plan · no 3D required

This live schematic shows room and fixture footprints and optional openings. On a phone, scroll within the drawing to read the measurements. It does not verify clearance or building requirements.

Open this panel to create the on-device floor plan.

Press “Open interactive 3D room” to start. Drag to orbit; scroll or pinch to zoom. Enable Edit layout to move fixtures.

1. Your room

Floor: 56 sq ft · 7 × 8 ft

Metric reference: 2.13 × 2.44 m · 5.20 m² · ceiling 2.44 m

Measurements, history & saving

Undo or redo up to 20 changes. Save an editable layout under “Save & continue” before leaving.

The 2D copy uses the nearest 3D colors, not exact tile patterns, grout or physical product specifications. Room limits: 5–20 ft wide, 6–25 ft long and 7–12 ft high. Adjusted measurements are flagged beside the inputs. Metric values are rounded references.

2. Materials & light

Tap any finish to preview it in 3D. Materials combine procedural finishes and bundled CC0 surface scans. They illustrate style only—not actual products, slip ratings or installation specifications.

3. Fixtures & layout
Adjust the fixture arrangement

Choose a layout, then drag a visible fixture directly in the 3D view with a finger or mouse. You can also use the position sliders with a keyboard.

Enter the actual width and depth from a product specification if you have them. The turquoise floor outline represents that rectangular footprint. The placeholder inside is simplified; plumbing, doors, wall clearance and suitability are not verified.

Shower: 24% from left; 23% from back.

Fixture center measured from walls: —

Distances are to the center of the selected footprint, not free space around it. Red outlines indicate visually overlapping footprints. Neither these distances nor alerts validate accessible clearances, service connections or safety requirements.

Place a door or window

Add conceptual openings to either of the two visible walls. Sizes are illustrative, not selected products. The front and right sides stay open so you can see inside.

The example door is about 78 cm wide and the window 100 cm wide. The doorway warning uses a simple 65 cm interior zone only. Door swing, accessibility, structural walls, glazing rules, ventilation and permits are not validated.

4. Save & continue

Download this layout as editable JSON to reopen it later, or save a measured 2D SVG floor plan to view or print. Both are generated on your device, even without WebGL. The SVG shows schematic positions, not legally required clearances or verified products.

No files are uploaded or stored by PCW.

Illustrative 3D only: fixtures are simplified placeholders, and clearance, door swing, plumbing, electrical safety, waterproofing, ventilation and product dimensions have not been checked. Wall/floor patterns are procedural illustrations, not licensed product photography. Check real measurements and supplier specifications before buying.

Trace a full bathroom tile budget

A detailed 40 sq ft illustrative scenario separates floor and shower tile, package rounding, fixture allowances and quoted labor. It is an educational case with transparent, hypothetical amounts, not a claim about local market rates or site suitability.

Read the step-by-step worked case →

Bathroom measurement tool

Plan floor tile and shower-wall tile separately

Measure the room floor independently from the tiled shower walls. Use the actual packaging coverage for each tile product to calculate whole cartons; do not combine cartons from different tile systems or assume they are interchangeable.

Floor measurements

Shower-wall tile (optional, a separate material)

Measure the combined horizontal run of all tiled shower walls and the height to be tiled. Subtract only openings that will not receive that tile. If the walls have different heights, calculate each section separately.

Cutting extras are your own allowances, not site defaults. This is a surface quantity calculator; it does not specify waterproofing, acceptable substrates, tile suitability, slopes or local building-code requirements.

Estimate project cost

Use rates from your supplier, installer or quote. ProjectCalcWorks does not insert a hidden national price assumption.

Use allowances instead of pretending every bathroom costs the same

Bathroom remodel budgets vary sharply with fixtures, tile, plumbing scope, demolition and labor. Treat the calculator as a transparent allowance model and replace each rate with a project-specific quote where possible.

Use related tile, paint or flooring calculators when you need a measured material quantity before assigning cost.

  • Separate finish allowances from labor.
  • Keep contingency visible rather than hidden.
  • Update the estimate as selections become known.

From finish inspiration to an actionable bathroom plan

Use the design planner to compare a warm spa look, a modern high-contrast bathroom or a softer green-and-wood palette. Changing the proposed vanity or shower changes your planning checklist, not a hidden estimate. A decorative drawing cannot confirm that your chosen fixtures fit, and a style label cannot determine a local contractor price.

Once the concept is clear, transfer the actual room dimensions into the tile takeoff. Floor tile and wet-area wall tile are different materials, so they must have their own coverage and extra allowance. Next, use the cost form with your supplier and installer prices. The design tool will never fill in fabricated rates or automatically add unquoted work to your budget.

A cosmetic refresh often preserves plumbing locations and existing surfaces, while replacing fixtures or rebuilding a shower can introduce removal, waterproofing, ventilation and licensed-trade considerations. This is a scope comparison, not a promise that a project is cheap, permitted or physically possible. Verify site conditions and professional requirements before ordering.

Choose bathroom finishes for the room you actually have

The three visual styles in the planner are starting palettes, not products or construction specifications. Before choosing a tile or vanity, bring actual samples into the room and inspect them under daytime and evening lighting. A preview on a phone cannot reproduce the scale, texture, gloss or color of installed materials.

Practical choices to check before requesting bathroom material quotes
Design choiceVisual effectWhat changes in the real project
Offset rectangular wall tileRepeated grout joints and a more detailed wall patternAsk for the actual tile dimensions, pattern offset, grout width, substrate suitability and installer cutting allowance
Large-format wall tileFewer visible joints on many layoutsCheck wall flatness, handling, edge cuts and any additional substrate preparation; fewer joints do not make an installation automatically waterproof
Vertical stacked wall tileStrong vertical lines and a different sense of proportionConfirm tile orientation is approved, joint alignment around niches and corners, and where cut pieces land
Stone-look or wood-look porcelain floorNatural-material appearance without assuming natural stone or real woodVerify the exact product's wet-floor slip performance, cleaning instructions, shade variation, grout and substrate requirements
Single versus double vanityDifferent storage and counter arrangementsMeasure actual cabinet width, door and drawer swings, circulation and plumbing; floor area alone cannot prove a double vanity fits
Keeping a tub versus considering a walk-in showerA different wet-area look and daily useCheck drainage, required slopes, entry clearance, waterproofing, accessibility, demolition and plumbing with qualified trades

For the same 8 × 7 ft (56 sq ft) room used in the tile example below, switching from an offset wall pattern to a large-format wall tile does not change the measured floor area. It can, however, change the tile SKU, carton coverage, cutting layout, labor quotation and suitability for the shower walls. Therefore, keep the design choice separate from the exact product measurements and quoted unit prices.

Compare remodel scopes before comparing contractor prices

A refresh, a finishes replacement and a full remodel can share the same mood board but have different work and risks. Record what stays and what changes before deciding which quote is less expensive.

Example scope distinctions, without assumed regional costs
ScopeTypical planning questionQuotes and checks to request
Cosmetic refreshCan sound existing surfaces and fixture locations remain?Written paint and finish preparation, fittings, ventilation checks and any separately quoted repairs
Surfaces and fixturesWhich floor or shower finishes, vanity and fittings are actually being replaced?Separate tile cartons, removal, substrate preparation, waterproofing scope, fixture supply and installation
Full remodelAre layout or plumbing/electrical locations changing?Site survey, qualified trade scopes, demolition, ventilation, approvals, schedule, access and explicit contingencies

Buying sequence: agree on a scope → measure each surface → choose manufacturer-verified products → obtain comparable written quotes → enter actual material/labor rates into the calculator → carry one selected project estimate into Project Budget. Never add both competing contractor bids or duplicate tile material within a bundled rate and a fixed extra.

How this estimate works

Enter floor area and any per-square-foot material or labor allowances you want to compare. Use fixed extras for fixtures, plumbing, electrical, permits, cabinetry or other quoted items.

total = adjusted material quantity × material rate + project quantity × labor rate + fixed extras

Example

A 60 sq ft bathroom with $80/sq ft in material allowance and $100/sq ft in labor starts at $4,800 material and $6,000 labor before fixed items. Example rates are illustrative only; replace them with supplier or contractor pricing for your project.

Build the bathroom budget from separate scope items

A floor-area allowance is only a planning shortcut. Use the measurement tool above to take off floor tile and shower-wall tile independently. For a complete budget, keep fixture packages, tile, plumbing, electrical, demolition, cabinetry, waterproofing and permits visible as separate quote or allowance items. Do not also charge the same floor materials in both the square-foot rate and fixed extras.

Use the Tile Calculator for measured tile quantity and the Paint Calculator for finish-paint quantity before assigning local prices. Add the completed bathroom estimate to the Project Budget Workspace when it is part of a larger project.

This calculator does not decide code, waterproofing, ventilation, structural or licensed-trade requirements. Those depend on the actual project and local rules.

Worked example: bathroom floor and shower are different tile purchases

Suppose your bathroom floor measures 8 × 7 ft. The measured floor is 56 sq ft. With a chosen 10% extra for cuts, you need to cover 61.6 sq ft. If the floor tile you select actually covers 12 sq ft per carton, round 61.6 ÷ 12 upward to 6 floor tile cartons.

Now consider a tiled shower-wall section with a combined 5 ft horizontal wall run and 7 ft tiled height, minus 3 sq ft of untiled openings. The wall tile area is 5 × 7 − 3 = 32 sq ft. With its own 15% cutting allowance, plan for 36.8 sq ft of shower wall tile. If that different wall tile product covers 10 sq ft per carton, you need 4 wall tile cartons.

These are illustrative measurement, cutting and packaging assumptions — not recommended waste rates, product coverage values or local prices. Keep the 6 floor cartons and 4 wall cartons separate; cartons from distinct tile products are not interchangeable. The room's 56 sq ft is still the floor-area basis for the general budget form. Shower-wall labor, waterproofing and fixtures need their own project quotes.

How to avoid an incomplete bathroom quote

Ask every contractor for the scope in writing. Separate waterproofing and substrate preparation from decorative tile materials, confirm who supplies the vanity, toilet, shower components and ventilation, and identify removal, disposal, permit, electrical and plumbing work. Compare quote exclusions explicitly rather than assuming a low square-foot price covers the same work.

The measurement tool estimates a material quantity, not a compliant waterproofing assembly or a finished remodeling price. Professional waterproofing, drainage, electrical and plumbing decisions depend on the actual project and local rules. Use the side-by-side contractor quote comparison before choosing an installer.

Bathroom remodel scope checklist

Two bathrooms with the same floor area can have very different budgets. Before comparing scenarios, write down which of these scope groups are actually changing:

Use the square-foot fields only for costs that genuinely scale with area. Put quoted fixture packages and one-time scope items into fixed extras, or keep them as separate line items in the Project Budget Workspace when you need a more auditable breakdown.

Related tools

Measure materials for the bathroom project · All Cost Calculators · Calculation Methodology

Keep planning

Related tools for this project

Share this free calculator

Send this calculator to a homeowner, contractor or DIY partner

Share the canonical ProjectCalcWorks link without an account or signup requirement.